wind-2

Case Studies
GE 1.5MW Wind Turbine - Winergy Gearcase First Intermediate Shaft Bearing Defect (File size = 494KB)
Reviews the detection method, correction and financial savings arising from the early detection of a bearing defect.
GE 1.5MW Wind Turbine - Moventas Gearcase Second Intermediate Shaft Pinion Broken Tooth (File size = 380KB)
Reviews the detection method, correction and financial savings arising from the early detection of a gear pinion localized defect.